Open-source defense reporting in December 2016 placed one, possibly two, Russian Oscar II-class SSGNs in the eastern Mediterranean near NATO carrier groups operating off Syria. The evidence supports conflict-theater naval presence and carrier-group pressure/protection, not confirmed Oscar II weapons release in Syria.
Role detailsOscar II-class submarine
- Oscar II
- Oscar II-class
- Project 949A
- Project 949A Antey
- Antey-class
- Antei-class
- NATO: Oscar II
The Oscar II-class submarine is NATO's reporting name for Project 949A Antey, the improved Soviet/Russian third-generation nuclear-powered cruise-missile submarine designed by Rubin and built by Sevmash. The class was built around a carrier-strike mission with 24 P-700 Granit anti-ship missiles in side launchers, a large double-hull SSGN design, long endurance, and improved crew habitability; later Project 949AM modernization reporting centers on replacing the Granit fit with newer cruise missiles.
Role in Conflicts
Profile / Specs
Profile
- Origin
- Soviet Union / Russia
- Built by
- Sevmash
- Built in
- Russia
- Type
- Nuclear-powered cruise missile submarine
- Service note
- 1980s-present
- Designer
- Central Design Bureau for Marine Engineering "Rubin"
- Designed
- 1969 government assignment for a nuclear submarine with the Granit missile complex
- Produced
- 1985-1999
- Number built
- 11 Project 949A boats completed
- Developed from
- Project 949 Oscar I
Specifications
- Displacement
- 15,100 tonnes surfaced; 25,650 tonnes submerged
- Length
- 154.7 metres
- Beam
- 18 metres
- Draft
- 9.5 metres
- Crew
- 48 officers and 59 crew
- Endurance
- 120 days
- Diving depth
- 600 metres
- Speed
- 14.6 knots surfaced; 33.4 knots submerged
- Propulsion
- 2 VM-4P pressurized-water reactors; 2 OK-300 steam turbines
- Missile battery
- 24 P-700 Granit anti-ship cruise missiles in side launchers outside the pressure hull
- Torpedo tubes
- 4 × 533 mm bow tubes and 2 × 650 mm bow tubes
- Armament
- 24 P-700 Granit cruise missiles; 533 mm and 650 mm torpedo tubes for torpedoes, anti-submarine missiles, and mines
- Modernization missile fit
- Project 949AM reporting describes replacement of the Granit-centered fit with newer cruise missiles including Kalibr and Oniks
Design And Missile Layout
Project 949A is best understood as a large cruise-missile submarine built around salvo attack against major surface groups, especially aircraft-carrier formations.
The class carried 24 Granit missiles in angled launch tubes arranged along the sides between the inner pressure hull and outer hydrodynamic hull.
Open references describe a double-hull submarine, with the improved Oscar II about 10 metres longer than Oscar I and fitted with upgraded electronic systems.
Project 949AM reporting centers on replacing the original Granit-centered fit with a more flexible cruise-missile load.
Primary support: Project 949A; Project 949 Granit / Oscar I; Project 949A Antey / Oscar II; The Aviationist: Oscar II Mediterranean search.
Variants
Project 949A Antey is the improved Oscar II production design that followed the two Project 949 Granit/Oscar I boats; Project 949AM is the modernization path reported for selected Project 949A submarines.
| Variant | Configuration | Designation notes |
|---|---|---|
| Project 949A Antey | Baseline Oscar II SSGN | Rubin says the improved Project 949A design started with the third ship in the 949/949A line and was built around a long-range Granit missile complex for action against carrier strike forces. Sources: Project 949A |
| Project 949AM | Modernized missile fit | Open-source reporting describes Project 949AM as a modernization path intended to replace the original 24-missile Granit fit with a larger load of newer cruise missiles such as Kalibr and Oniks. |
Carried Missile Fit
The baseline Project 949A design is defined by its heavy Granit anti-ship missile battery; modernization reporting describes a later path toward smaller cruise missiles in larger numbers.
| Carried item | Item type | Carriage evidence |
|---|---|---|
![]() | Original anti-ship missile battery | Rubin identifies the Project 949A mission around the Granit missile complex, and open references describe the Oscar layout with 24 SS-N-19/P-700 missiles in side launchers. Sources: Project 949A, Project 949 Granit / Oscar I; Project 949A Antey / Oscar II, P-700 Granit/SS-N-19 Shipwreck |
![]() | Reported Project 949AM modernization missile | Project 949AM reporting describes replacing the 24 SS-N-19 missiles with a larger load of newer 3M54 Klub/Kalibr-family missiles on modernized Oscar II boats. |
![]() | Reported Project 949AM modernization missile | The same modernization reporting describes Oniks as another missile family associated with the Project 949AM rearmament path. |
Timeline
Oscar II-class submarine Key Events
Granit submarine requirement is issued
Rubin says the Soviet government assigned development of a nuclear submarine with the Granit missile complex in 1969, setting the program that led from Project 949 to the improved Project 949A.
Sources: Project 949A
Project 949 enters service
Open references place the first Project 949/Oscar I boat in service in 1980, before the enlarged and improved Project 949A/Oscar II design followed.
Sources: Project 949 Granit / Oscar I; Project 949A Antey / Oscar II
Oscar II deployment reported in the eastern Mediterranean
Defense reporting said one, possibly two, Russian Oscar II-class submarines were operating near NATO carrier groups off Syria, with no public evidence that an Oscar II fired weapons in the Syrian campaign.
Sources: The Aviationist: Oscar II Mediterranean search, Popular Mechanics: NATO hunting carrier killer submarines
Media
Oscar II-class submarine Images
Related Weapon Systems













